EverWind, in partnership with Membertou First Nation, is jointly developing, constructing, and operating the Bear Lake Wind Project. The project will include 11 wind turbines and generate up to 88 MW of wind energy across West Hants Regional Municipality, the Municipality of the District of Chester, and Halifax Regional Municipality in Nova Scotia.

The Bear Lake Wind Project is part of EverWind’s Phase 1 power generation and renewable energy buildout that will supply clean electricity to the Point Tupper Green Fuels Project facility, which will produce green hydrogen and green ammonia for both domestic and international markets. The Environmental Assessment for the Bear Lake Wind Project was approved in December 2023, and construction is expected to begin in 2026.

The Bear Lake Wind Project reflects our commitment to Indigenous leadership, economic reconciliation, and long-term sustainability. The project will create local jobs, deliver lasting regional benefits, and advance Indigenous ownership in Canada’s clean energy future. It will help position Atlantic Canada as a trusted supplier in the global clean energy market.

Resources

Here you’ll find important documents related to the Bear Lake Wind Project, including community presentations, one-pagers, and Environmental Assessments.

All documents are available for download in PDF format.

Community Commitments

As the Bear Lake Wind Project has progressed, EverWind has been committed to working closely with landowners, residents, local businesses, and community organizations. We will continue to build strong relationships by listening and responding to feedback and questions in a timely and respectful manner.

Public engagement began in 2023, with open houses held in August and September 2023. A detailed revised project layout was shared in June 2025, followed by an open community discussion. We continue to engage with rightsholders, municipalities, and community members to ensure our projects reflect local needs and priorities.

Community input plays a vital role in shaping our projects. We welcome your feedback and encourage you to stay involved as development continues.

EverWind is committed to open communication and long-term collaboration with the communities where we operate. As part of that commitment, we established a Community Liaison Committee (CLC) for the Bear Lake Wind Project in 2025.

The CLC is a volunteer group made up of people from across the region, including municipal leaders, landowners, local residents, and members of community organizations. Members were selected through a public call for interest, which included advertisements in local newspapers.

The committee provides a way for community members and EverWind to regularly connect and exchange information. Its purpose is to:

  • Support ongoing communication about the design, construction, and operation of our wind projects
  • Offer a space for local concerns, questions, and ideas to be shared and discussed
  • Provide input on potential project impacts and how they can be managed
  • Help shape and inform community benefit programs, including how support is allocated

The Bear Lake Wind Project Community Liaison Committee serves as a vital link between the community and the project team, providing a forum for sharing information, addressing concerns, and ensuring open communication. The CLC plays an important role in making sure the project reflects the priorities and interests of the community while working collaboratively to find solutions.

Committee Members

If you have questions, feedback, concerns or opportunities that relate to the Bear Lake Wind Project, please feel free to reach out to the project team or any of the committee members listed below.

Lloyd Blagdon – lloyd.bearlake.clc@gmail.com

Linda Skinner – moxsomskinner@gmail.com

Peter Mugridge – muggy6563@gmail.com

Sumaya Moore – mooresumaya@hotmail.com

Nathan Lake – nathanlake16@gmail.com

Kayla Pinch – councillor.leary-pinch@westhants.ca

Dougie Ross – dougieross@eastlink.ca

Markus Kehoe – mark@jcbakker.com

The Bear Lake Wind Project is guided by our commitment to environmental responsibility and sustainability. We believe that protecting the natural environment is essential to the long-term success of the project and the well-being of local communities.

As part of Nova Scotia’s rigorous environmental review process, all major renewable energy projects must complete a formal Environmental Assessment. Throughout 2022 and 2023, EverWind worked with Strum Consulting, a respected local environmental firm, to carry out more than 5,000 hours of field studies and reporting for the Bear Lake Wind Project.

The Environmental Assessment examines the potential environmental, cultural, and social impacts of the project after the implementation of mitigations. Areas of assessment include wetlands and watercourses, plants, lichen, habitat, birds and bats, terrestrial wildlife, noise, shadow flicker, and visual impacts, electromagnetic interference, and archaeology. This work helps ensure the project moves forward in a responsible and informed way.

The Bear Lake Wind Project received Environmental Assessment approval in December 2023.

Stay Up to Update

Keeping the community informed is important to us. For regular updates, press releases, newsletters, community notices, and other project-related materials, visit our Resources & Media page.

More Projects

Point Tupper Green Fuels Project

EverWind, in partnership with Mi’kmaq First Nation communities of Paqtnkek, Potlotek, and Membertou, is jointly developing, constructing, and operating the Point Tupper Green Fuels Project. This is an industry-leading clean energy initiative and the first of its kind in Canada.

Kmtnuk Wind Project

In partnership with Membertou First Nation, the Kmtnuk Wind Project will generate up to 128 MW of wind energy in the Municipality of Colchester, Nova Scotia. The project received Environmental Assessment Approval in December 2023.

Windy Ridge Wind Project

In partnership with Mi’kmaq First Nation communities of Paqtnkek, Potlotek, and Membertou, the Windy Ridge Wind Project will generate up to 376 MW of wind energy in the Municipality of Colchester, Nova Scotia. The project received Environmental Assessment Approval in July 2024.

Upper Afton Wind Project 

In partnership with First Nations, the Upper Afton Wind Project will generate up to 176 MW of wind energy across the Municipality of the County of Antigonish and the Municipality of the District of Guysborough, Nova Scotia. The project’s Environmental Assessment will be registered in late 2025.

Guysborough Wind Projects

As Phase 2 of EverWind’s wind farm developments, the Guysborough Wind Projects, Setapuktuk Wind Project, Wind Farm 2, and Wind Farm 3, will deliver up to 2.5 GW of clean power in partnership with First Nations. These projects will generate lasting local benefits, create jobs, and power EverWind’s Point Tupper Green Fuels Project, connected via the Strait Crossing Transmission Line Project.

Burin Peninsula Green Fuels Project 

The Burin Peninsula Green Fuels Project will bring up to 3 GW of new wind and solar development to Newfoundland and Labrador to produce green hydrogen and ammonia using renewable electricity from wind and solar energy, without drawing power from the provincial grid.

EverWind is located on the traditional and unceded territories of the Mi'kmaq, Wolastoqiyik (Maliseet), Beothuk, Innu, and Inuit Peoples of Atlantic Canada. We honour their enduring presence, knowledge, and stewardship of these lands and waters, and we recognize the Peace and Friendship Treaties as ongoing agreements based on mutual respect and coexistence. We are committed to listening, learning, and working toward reconciliation with Indigenous communities across Turtle Island (North America). We also recognize that African Nova Scotians are a distinct people whose histories, legacies, and contributions have enriched that part of Mi'kma'ki known as Nova Scotia for over 400 years.